How Much Does an ADU Cost in 2026?
The average cost to build an accessory dwelling unit (ADU) in the United States typically falls between $150,000 and $300,000 for a new detached unit. Simpler projects such as garage or basement conversions often come in between $50,000 and $150,000.
These figures include design, permits, construction, and basic utility connections. Final costs vary significantly by location, size, finish level, and site conditions. High-cost metros such as the San Francisco Bay Area, Seattle, and Los Angeles regularly exceed national averages.
ADU Cost by Type (2026 Averages)
Detached New ADU
Standalone backyard unit. Highest cost because it requires full foundation, roof, and utility runs.
See details →Garage Conversion
Often the most affordable route. Uses existing structure, so major savings on foundation and framing.
See details →Attached ADU
Shares a wall with the main house. Lower cost than fully detached but still requires significant work.
See details →Prefab / Modular ADU
Factory-built units can reduce labor time. Site work, foundation, and utilities are usually extra.
See details →What Affects ADU Cost the Most?
- Location — Labor rates, permit fees, and seismic or energy codes vary widely by metro and state.
- Type of ADU — Conversions are cheaper than new construction. Detached units cost the most.
- Size — Fixed costs (kitchen, bathroom, utilities) mean smaller units often cost more per square foot.
- Site conditions — Slopes, poor soil, long utility runs, and restricted access increase price quickly.
- Finish level — Basic finishes vs. high-end kitchens, bathrooms, and exterior materials.
Quick Cost Snapshot by Size
| Size | Typical Layout | National Range (Detached) |
|---|---|---|
| 400 sq ft | Studio / compact 1-bed | $90,000 – $180,000 |
| 600 sq ft | 1 bedroom | $130,000 – $240,000 |
| 800 sq ft | 1–2 bedroom | $170,000 – $300,000 |
| 1,000 sq ft | 2 bedroom | $210,000 – $360,000+ |
Ranges are approximate national averages for 2025–2026 and exclude extreme high-cost or luxury projects. Always get local contractor bids.
Popular Guides
Full Cost Breakdown
See where the money goes — design, permits, foundation, framing, kitchen, utilities, and more.
Read the breakdown →Frequently Asked Questions
Common questions about ADU costs, timelines, permits, and value answered clearly.
View FAQ →